BEASLEY BRIAN ROBERT project — 27-26-16
27-26-16
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-16PASCO_NOCCaptured Pasco_2026086953 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026018965 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_27-26-16-0040-00G00-0000_65474194 from fl_dor_cadastral
- 2026-06-08PASCOPACaptured PASCOPA_27-26-16-0040-00G00-0000_65474194 from pascopa
- 2026-06-27FL_DOR_CADASTRALCaptured FDOR_27-26-16-0040-00G00-0000_0414a741 from fl_dor_cadastral
- 2026-06-29PASCOPACaptured PASCOPA_27-26-16-0040-00G00-0000_0414a741 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 18.0 mi | 36.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 18.1 mi | 36.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 23.4 mi | 46.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 24.1 mi | 48.2 |
| quarry | Brooksville Quarry | Brooksville | 30.8 mi | 61.6 |
| quarry | Brooksville South Cement Plant | Brooksville | 31.5 mi | 63.1 |
| quarry | Calcium Plant | Jacksonville | 34.4 mi | 68.9 |
| quarry | Caloosa Materials | Ruskin | 37.2 mi | 74.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026086953 | 2026-05-16 | Open ↗ |
| pasco_noc | Pasco_2026018965 | 2026-05-21 | Open ↗ |
| fl_dor_cadastral | FDOR_27-26-16-0040-00G00-0000_65474194 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_27-26-16-0040-00G00-0000_65474194 | 2026-06-08 | Open ↗ |
| fl_dor_cadastral | FDOR_27-26-16-0040-00G00-0000_0414a741 | 2026-06-27 | Open ↗ |
| pascopa | PASCOPA_27-26-16-0040-00G00-0000_0414a741 | 2026-06-29 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 27-26-16-0040-00G00-0000
- Strap
- 27-26-16-0040-00G00-0000
- Address
- 7510 WIMPOLE DRIVE, NEW PORT RICHEY
- Zip
- 34655
- Acreage
- 1.03 ac
- Sq ft
- 44,867
No sale on record
- Just (market)
- $0
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/beasley-brian-robert-project-27-26-16-pasco-fl-d4c64cb2