Leads/bdf15427
Approved · application_filedManatee County

Skyway Bridge Timber Fishing Piers FDOT FPID No. 456297-1

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Skyway Bridge Timber Fishing Piers FDOT FPID No. 456297-1

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$10
Actual — from source record
Acreage
Parcel 2140600009
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
FDOT
Why this is a hauling opportunity: Base unknown/other (20) | roadway/highway keywords (+25) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_937214 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_2140600009_bdf15427 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
11.7 mi
Round trip
23.5 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
13.6 mi
Round trip
27.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin13.6 mi27.3
quarryTampa Cement Grinding PlantTampa26.5 mi52.9
quarryWingate Creek MineLithia31.0 mi62
quarrySouth Pasture MineLithia41.4 mi82.7
quarryFour CornersLithia41.6 mi83.1
quarryCentral State Aggregates LLCZephyrhill47.0 mi94
quarryFlorida Shell & Fill Company LLCNaples47.4 mi94.8
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton11.7 mi23.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9372142026-05-17Open ↗
fl_dor_cadastralFDOR_2140600009_bdf154272026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
2140600009
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/bdf15427