Approved · unknownPasco County
BARROS PAUL project — 20-26-18
20-26-18
Load estimate pending
Lifecycle
Active as of May 14, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
BARROS PAUL project — 20-26-18
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
Why this is a hauling opportunity: NOC — unclassified description: 20-26-18 | Connector base: 50 | Stage = under_construction — actionable now (+10) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-16PASCO_NOCCaptured Pasco_2026090456 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
ACTIVENotice of Commencement (NOC)(Notice of Commencement)
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026090456 | 2026-05-16 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/barros-paul-project-20-26-18-pasco-fl-6f7d79e3