Leads/barmore-heri-project-13-25-17-pasco-fl-60b8522e
Approved · unknownPasco County

XPRESS FLOORING AND MORE INC project — 13-25-17

13-25-17

~3.1kloads
fill dirt + base rock
~5 mo
Lifecycle
Permitted as of Jun 13, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

XPRESS FLOORING AND MORE INC project — 13-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
22.61 ac
Parcel 13-25-17-0020-00C00-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
XPRESS FLOORING AND MORE
Developer / Applicant
BARMORE HERI
Why this is a hauling opportunity: NOC — unclassified description: 13-25-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 23 ac disturbed, ~3140 est. loads (+25) | size signal: 23 ac disturbed, ~3140 est. loads (+25) | size signal: 23 ac disturbed, ~3140 est. loads (+25) | size signal: 23 ac disturbed, ~3140 est. loads (+25)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2024103611 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_13-25-17-0020-00C00-0000_08d26b74 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_13-25-17-0020-00C00-0000_08d26b74 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
6.8 mi
Round trip
13.7 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 6.8 mi13.7
sand pitCounty Line MineSpring Hill8.6 mi17.1
quarryCentral State Aggregates LLCZephyrhill17.6 mi35.3
quarryBrooksville QuarryBrooksville20.2 mi40.5
quarryBrooksville South Cement PlantBrooksville20.8 mi41.7
quarryCalcium PlantJacksonville23.9 mi47.9
quarryTampa Cement Grinding PlantTampa26.7 mi53.5
quarryCenter Hill MineBrooksville26.9 mi53.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
BARMORE HERI
1 active project · Pasco
~3,140 est. loads · fill dirt
Contractor
XPRESS FLOORING AND MORE

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20241036112026-05-21Open ↗
fl_dor_cadastralFDOR_13-25-17-0020-00C00-0000_08d26b742026-05-28Open ↗
pascopaPASCOPA_13-25-17-0020-00C00-0000_08d26b742026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
13-25-17-0020-00C00-0000
Strap
13-25-17-0020-00C00-0000
Address
Acreage
22.61 ac
Sq ft
984,892
Owner of record
HOMEOWNERS ASSOCIATION AT
SUNCOAST LAKES INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars