CCCL — Fences - Sand Collecting (Lynn Tinsley)
1824 Plantation Pass, St. George Island
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/24/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CCCLCaptured FDEP_CCCL_-8044212 from fdep_cccl
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| transfer station | FRANKLIN COUNTY CENTRAL LANDFILL | Eastpoint | 11.8 mi | 23.6 |
| landfill | FIVE POINTS CLASS III LANDFILL | Port St Joe | 24.5 mi | 49 |
| transfer station | INDUSTRIAL ROAD TRANSFER STATION | Port St Joe | 25.8 mi | 51.6 |
| landfill | (unnamed) | — | 9.0 mi | 18 |
| landfill | (unnamed) | — | 11.8 mi | 23.6 |
| landfill | (unnamed) | — | 14.0 mi | 28 |
| landfill | (unnamed) | — | 24.5 mi | 49.1 |
| landfill | (unnamed) | — | 25.8 mi | 51.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cccl | FDEP_CCCL_-8044212 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/b88cdc40