West Lake Jackson Infrastructure Upgrades - Phase 4

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

West Lake Jackson Infrastructure Upgrades - Phase 4

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
City of Sebring
Why this is a hauling opportunity: Base unknown/other (20) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_941025 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
South Fort Meade Mine · Lithia
One-way
19.7 mi
Round trip
39.4 mi
TypeNameCityOne-wayRT mi
quarrySouth Fort Meade MineLithia19.7 mi39.4
sand pitDiamond Sand PlantJacksonville27.3 mi54.6
sand pitLake Wales Dry PlantDavenport27.6 mi55.2
sand pitLake Wales Sand MineBrooksville27.6 mi55.2
quarrySouth Pasture MineLithia30.4 mi60.8
quarry4M-31 MineAlva31.0 mi62.1
quarryFour CornersLithia35.1 mi70.2
quarryFarabee Mine & Shell LLCPunta Gorda36.3 mi72.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
City of Sebring

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (General))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Highlands County Permits
Sebring Building Department
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9410252026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Highlands
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)