Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — SUNNY FL DAIRY
2109 N 40TH ST, TAMPA, FL, 33605
~12loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — SUNNY FL DAIRY
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.047 ac
Parcel 1605420000
Est truck loads
—
Needs site plan parse
Sources seen
8
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922377 from fdep_cleanup_sites
- 2026-06-11HCPACaptured HCPA_1605420000_b7cc3b6e from hcpa
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87942814 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_1605420000_7f25d655 from hcpa
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87983679 from fdep_cleanup_sites
- 2026-06-19HCPACaptured HCPA_1605420000_3cd92372 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88085724 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_1605420000_d6d3d8e9 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.6 mi
Round trip
5.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 2.6 mi | 5.1 |
| quarry | Caloosa Materials | Ruskin | 18.0 mi | 36.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 18.1 mi | 36.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 29.6 mi | 59.1 |
| quarry | Four Corners | Lithia | 30.4 mi | 60.8 |
| sand pit | County Line Mine | Spring Hill | 33.8 mi | 67.5 |
| quarry | South Pasture Mine | Lithia | 36.0 mi | 71.9 |
| quarry | Wingate Creek Mine | Lithia | 36.7 mi | 73.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87922377 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_1605420000_b7cc3b6e | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87942814 | 2026-06-11 | Open ↗ |
| hcpa | HCPA_1605420000_7f25d655 | 2026-06-12 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87983679 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_1605420000_3cd92372 | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88085724 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_1605420000_d6d3d8e9 | 2026-06-26 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1605420000
- Strap
- A-16-29-19-4CZ-000012-A0000.0
- Address
- 2109 N 40TH ST, TAMPA
- Zip
- 33605
- Acreage
- 0.047 ac
- Sq ft
- 2,039
- Homestead
- NO
Owner of record
GUAGLIARDO BELT LLC
Last sale
2023-07-07
$2,365,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/b7cc3b6e