Approved · application_filedHillsborough County
2001 E Fowler Ave B T 33612
2001 E Fowler Ave B T 33612
~49loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Apr 30, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
2001 E Fowler Ave B T 33612
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.437 ac
Parcel 1411921400
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base unknown/other (20) | size signal: ~49 est. loads (+6)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-20TAMPA_ACCELACaptured ABS-26-0000065 from tampa_accela
- 2026-05-20TAMPA_ACCELACaptured CRT-26-0000196 from tampa_accela
- 2026-05-21HCPACaptured HCPA_1411921400_b70c0ae8 from hcpa
- 2026-05-22HCPACaptured HCPA_1411921400_b9ab70c1 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
8.1 mi
Round trip
16.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 8.1 mi | 16.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 13.5 mi | 27 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 23.2 mi | 46.4 |
| quarry | Caloosa Materials | Ruskin | 24.2 mi | 48.4 |
| sand pit | County Line Mine | Spring Hill | 27.4 mi | 54.8 |
| quarry | Four Corners | Lithia | 34.8 mi | 69.6 |
| quarry | West Florida Aggregate | Webster | 36.3 mi | 72.6 |
| quarry | Brooksville Quarry | Brooksville | 36.6 mi | 73.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| tampa_accela | ABS-26-0000065 | 2026-05-20 | Open ↗ |
| tampa_accela | CRT-26-0000196 | 2026-05-20 | Open ↗ |
| hcpa | HCPA_1411921400_b70c0ae8 | 2026-05-21 | Open ↗ |
| hcpa | HCPA_1411921400_b9ab70c1 | 2026-05-22 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1411921400
- Strap
- A-18-28-19-ZZZ-000005-58820.0
- Address
- 2001 E FOWLER AVE, TAMPA
- Zip
- 33612
- Acreage
- 0.437 ac
- Sq ft
- 19,052
- Homestead
- NO
Owner of record
RADHE KRISHNA PROPERTIES LLC
Last sale
2010-06-01
$2,500,000
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/b70c0ae8