Leads/b6f93af4
Approved · application_filedHillsborough County

Tyson Ave East

SWFWMD ERP — site address pending

~65loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Tyson Ave East

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.2M
Actual — from source record
Acreage
0.589 ac
Parcel 1311850050
Est truck loads
Needs site plan parse
Sources seen
5
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DRB Group Florida LLC
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $1,172,144 valuation, ~65 est. loads (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_935199 from swfwmd_erp
  2. 2026-05-20TAMPA_ACCELA
    Captured PPT-26-0000006 from tampa_accela
  3. 2026-05-22HCPA
    Captured HCPA_1311850050_aa7a6896 from hcpa
  4. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_183007ZZZ000005530500A_b6f93af4 from fl_dor_cadastral
  5. 2026-06-03HCPA
    Captured HCPA_1311850050_b6f93af4 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
6.6 mi
Round trip
13.3 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa6.6 mi13.3
quarryCaloosa MaterialsRuskin14.0 mi28.1
quarryCentral State Aggregates LLCZephyrhill26.3 mi52.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 34.5 mi69.1
quarryFour CornersLithia35.6 mi71.2
quarryWingate Creek MineLithia36.9 mi73.7
sand pitCounty Line MineSpring Hill37.7 mi75.4
quarrySouth Pasture MineLithia39.7 mi79.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DRB Group Florida LLC
2099 GAITHER ROAD, SUITE 600 ROCKVILLE, MD 20850

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9351992026-05-17Open ↗
tampa_accelaPPT-26-00000062026-05-20Open ↗
hcpaHCPA_1311850050_aa7a68962026-05-22Open ↗
fl_dor_cadastralFDOR_183007ZZZ000005530500A_b6f93af42026-05-28Open ↗
hcpaHCPA_1311850050_b6f93af42026-06-03Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1311850050
Strap
A-07-30-18-ZZZ-000005-53050.0
Address
5215 W TYSON AVE, TAMPA
Zip
33611
Acreage
0.589 ac
Sq ft
25,637
Homestead
NO
Owner of record
SE TAMPA BAY LLC
Last sale
2024-03-21
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/b6f93af4