Approved · unknownMARION County
Cleanup (petroleum cleanup) — BP-TAK III
1614 N MAGNOLIA AVE, OCALA, FL, 32670
Load estimate pending
Lifecycle
Active as of Jun 3, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — BP-TAK III
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 25794-000-00
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
City of Ocala
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-04FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87863028 from fdep_cleanup_sites
- 2026-06-08MARIONPACaptured MARIONPA_25794-000-00_b659b57e from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Stavola NW Pit · Ocala
One-way
4.7 mi
Round trip
9.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Stavola NW Pit | Ocala | 4.7 mi | 9.4 |
| quarry | NORTH MINE | OCALA | 5.7 mi | 11.3 |
| quarry | Lowell Mine & Mill | Ocala | 8.8 mi | 17.5 |
| quarry | Reddick Mine | Pompano Beach | 11.6 mi | 23.3 |
| quarry | Ocala Quarry | Atlanta | 13.8 mi | 27.6 |
| quarry | 328 Pit | Ocala | 13.9 mi | 27.8 |
| sand pit | Lynne Mine | Davenport | 14.3 mi | 28.6 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 22.7 mi | 45.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
City of Ocala
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87863028 | 2026-06-04 | Open ↗ |
| marionpa | MARIONPA_25794-000-00_b659b57e | 2026-06-08 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 25794-000-00
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/b659b57e