Leads/b3dc274e
Approved · unknownHILLSBOROUGH County

Cleanup (petroleum cleanup) — SLUSMEYER TIRE CITY

11312 E 92 HWY, SEFFNER, FL, 33584

~21loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 15, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — SLUSMEYER TIRE CITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.085 ac
Parcel 0632115000
Est truck loads
Needs site plan parse
Sources seen
12
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
JJ PRO ENTERPRISES LLC
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87799766 from fdep_cleanup_sites
  2. 2026-06-11FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87942876 from fdep_cleanup_sites
  3. 2026-06-15FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87983741 from fdep_cleanup_sites
  4. 2026-06-19HCPA
    Captured HCPA_0632115000_b3dc274e from hcpa
  5. 2026-06-25FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88085786 from fdep_cleanup_sites
  6. 2026-06-26HCPA
    Captured HCPA_0632115000_ddac8ba8 from hcpa
  7. 2026-06-28FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88106181 from fdep_cleanup_sites
  8. 2026-07-04FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88167352 from fdep_cleanup_sites
  9. 2026-07-05HCPA
    Captured HCPA_0632115000_c436cf1b from hcpa
  10. 2026-07-05HCPA
    Captured HCPA_0632115000_fad43346 from hcpa
  11. 2026-07-06HCPA
    Captured HCPA_0632115000_e4307d91 from hcpa
  12. 2026-07-06HCPA
    Captured HCPA_0632115000_fa262078 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.2 mi
Round trip
18.5 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa9.2 mi18.5
quarryCentral State Aggregates LLCZephyrhill14.1 mi28.2
quarryCaloosa MaterialsRuskin22.0 mi44
quarryFour CornersLithia26.4 mi52.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.8 mi57.6
quarrySouth Pasture MineLithia33.0 mi66
sand pitCounty Line MineSpring Hill33.8 mi67.5
quarryWingate Creek MineLithia36.5 mi72.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
JJ PRO ENTERPRISES LLC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_877997662026-05-28Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879428762026-06-11Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879837412026-06-15Open ↗
hcpaHCPA_0632115000_b3dc274e2026-06-19Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_880857862026-06-25Open ↗
hcpaHCPA_0632115000_ddac8ba82026-06-26Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_881061812026-06-28Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_881673522026-07-04Open ↗
hcpaHCPA_0632115000_c436cf1b2026-07-05Open ↗
hcpaHCPA_0632115000_fad433462026-07-05Open ↗
hcpaHCPA_0632115000_e4307d912026-07-06Open ↗
hcpaHCPA_0632115000_fa2620782026-07-06Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0632115000
Strap
U-33-28-20-264-000000-12700.0
Address
11312 E 92 HWY, SEFFNER
Zip
33584
Acreage
0.085 ac
Sq ft
3,696
Homestead
NO
Owner of record
JJ PRO ENTERPRISES LLC
Last sale
2021-11-29
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/b3dc274e