Leads/b233afb3
Approved · unknownSarasota County

Beach nourishment — Lido Key (360,000 cy)

Lido Key, Sarasota County, FL

Load estimate pending
Lifecycle
Completed as of Apr 1, 2001
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Beach nourishment — Lido Key (360,000 cy)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$4.3M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Beach nourishment Lido Key Beach Nourishment Project — 360,000 cy placed. Source: Offshore. Type: Nourishment. Counties with prior nourishment cycle every 6-10 years. | size signal: $4,320,000 valuation (+12) | size signal: $4,320,000 valuation (+12) | size signal: $4,320,000 valuation (+12) | size signal: $4,320,000 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SAND_PLACEMENT
    Captured FDEP_SANDPLACE_223 from fdep_sand_placement

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
28.1 mi
Round trip
56.2 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin28.1 mi56.2
quarryFlorida Shell & Fill Company LLCNaples29.3 mi58.6
quarryWingate Creek MineLithia30.7 mi61.4
quarryTampa Cement Grinding PlantTampa43.6 mi87.3
quarry4M-31 MineAlva44.7 mi89.4
quarrySouth Pasture MineLithia44.9 mi89.9
sand pitWashington Loop MinePunta Gorda45.6 mi91.2
quarryBermont Materials AlicoPunta Gorda47.3 mi94.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
fdep_sand_placementFDEP_SANDPLACE_2232026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/b233afb3