Approved · unknownMARION County
State 404 — 11875 E BLUE COVE DR - STEPHENSON (ERP & 404)
11875 E BLUE COVE DR, DUNNELLON, FL, 34432
Load estimate pending
Lifecycle
Permitted as of Nov 8, 2022
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
State 404 — 11875 E BLUE COVE DR - STEPHENSON (ERP & 404)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 3453-004-003
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
STEPHENSON ROBERT
Why this is a hauling opportunity: Base site_development/earthwork (65) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_STATE404Captured FDEP_ST404_0423185-003-SFG from fdep_state404
- 2026-06-01MARIONPACaptured MARIONPA_3453-004-003_b0a562a7 from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Manko Co Sec 5 Mine/Phos · Ocala
One-way
7.8 mi
Round trip
15.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 7.8 mi | 15.6 |
| quarry | 328 Pit | Ocala | 10.6 mi | 21.3 |
| quarry | Red Level Mine | Crystal River | 12.7 mi | 25.3 |
| quarry | Maylen Mine | Crystal River | 12.8 mi | 25.7 |
| quarry | Inglis Quarry | Brooksville | 13.4 mi | 26.9 |
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 13.4 mi | 26.9 |
| quarry | Lecanto Mine | Crystal River | 16.3 mi | 32.5 |
| quarry | NORTH MINE | OCALA | 22.1 mi | 44.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
STEPHENSON ROBERT
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_state404 | FDEP_ST404_0423185-003-SFG | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_3453-004-003_b0a562a7 | 2026-06-01 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 3453-004-003
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/b0a562a7