APD FOUNDATION REPAIR project — 28-25-16
28-25-16
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The APD Foundation Repair project is a site development initiative focused on earthwork, currently at the permit issued stage, located at 28-25-16. This project presents significant hauling opportunities due to its earthwork requirements, making it essential for hauling providers to engage with key stakeholders now. The main contacts for this project are Unlimited Grace LLC Trustee (owner/developer) and APD Foundation Repair as the prime general contractor, reachable at (352) 218-8246.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026016872 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 13.5 mi | 27 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 15.2 mi | 30.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 25.6 mi | 51.3 |
| quarry | Brooksville Quarry | Brooksville | 26.5 mi | 52.9 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.3 mi | 54.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 28.7 mi | 57.5 |
| quarry | Calcium Plant | Jacksonville | 29.9 mi | 59.9 |
| quarry | Center Hill Mine | Brooksville | 33.8 mi | 67.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026016872 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/apd-foundation-repair-project-28-25-16-pasco-fl-556cce63