Leads/alpha-foundations-project-20-26-17-pasco-fl-941e2241
Approved · unknownPasco County

ALPHA FOUNDATIONS project — 20-26-17

20-26-17

Load estimate pending
Lifecycle
Active as of May 14, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

ALPHA FOUNDATIONS project — 20-26-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
ALPHA FOUNDATIONS
📞 (813) 285-4163
Developer / Applicant
DIALOISO ROBERT
The story

The ALPHA FOUNDATIONS project is a site development initiative focused on earthwork, currently under construction at 20-26-17. This project presents significant hauling opportunities for providers due to its earthmoving requirements and high hauling score of 80/100, indicating strong demand for materials transport. Key contacts for this project include DIALOISO ROBERT (prime general contractor) and ALPHA FOUNDATIONS (owner/developer), who can be reached at (813) 285-4163 for potential collaboration.

Why this is a hauling opportunity: Hauling-likely contractor: ALPHA FOUNDATIONS | Connector base: 70 | Stage = under_construction — actionable now (+10) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-16PASCO_NOC
    Captured Pasco_2026089770 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
DIALOISO ROBERT
1 active project · Pasco
Contractor
ALPHA FOUNDATIONS
6 active projects · Hillsborough
~75 est. loads · fill dirt
📞 (813) 285-4163

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260897702026-05-16Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/alpha-foundations-project-20-26-17-pasco-fl-941e2241