ALLIANCE GENERAL CONTRACTING project — 25-25-19
25-25-19
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Alliance General Contracting's site development project at 25-25-19 is in permit-issued stage with significant earthwork scope, presenting immediate hauling opportunity for excavation material, fill, and site prep transport. With a strong 75/100 hauling score and an established contractor base, this project is ready for vendor engagement now. Key contacts are Alliance General Contracting (prime GC) and owner Stephanie Underwood—reach out directly to secure haul-off and material delivery contracts before mobilization begins.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025191166 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 6.6 mi | 13.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 10.7 mi | 21.4 |
| sand pit | County Line Mine | Spring Hill | 16.4 mi | 32.9 |
| quarry | West Florida Aggregate | Webster | 20.9 mi | 41.8 |
| quarry | Brooksville Quarry | Brooksville | 21.5 mi | 43 |
| quarry | Brooksville South Cement Plant | Brooksville | 21.5 mi | 43.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 24.3 mi | 48.6 |
| quarry | Calcium Plant | Jacksonville | 24.8 mi | 49.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025191166 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/alliance-general-contracting-project-25-25-19-pasco-fl-2078e5bb