Leads/alliance-general-contracting-project-25-25-19-pasco-fl-2078e5bb
Approved · unknownPasco County

ALLIANCE GENERAL CONTRACTING project — 25-25-19

25-25-19

Load estimate pending
Lifecycle
Permitted as of Oct 8, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ALLIANCE GENERAL CONTRACTING project — 25-25-19

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
ALLIANCE GENERAL CONTRACTING
Developer / Applicant
UNDERWOOD STEPHANIE
The story

Alliance General Contracting's site development project at 25-25-19 is in permit-issued stage with significant earthwork scope, presenting immediate hauling opportunity for excavation material, fill, and site prep transport. With a strong 75/100 hauling score and an established contractor base, this project is ready for vendor engagement now. Key contacts are Alliance General Contracting (prime GC) and owner Stephanie Underwood—reach out directly to secure haul-off and material delivery contracts before mobilization begins.

Why this is a hauling opportunity: General contractor NOC: ALLIANCE GENERAL CONTRACTING | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025191166 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
6.6 mi
Round trip
13.3 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill6.6 mi13.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 10.7 mi21.4
sand pitCounty Line MineSpring Hill16.4 mi32.9
quarryWest Florida AggregateWebster20.9 mi41.8
quarryBrooksville QuarryBrooksville21.5 mi43
quarryBrooksville South Cement PlantBrooksville21.5 mi43.1
quarryTampa Cement Grinding PlantTampa24.3 mi48.6
quarryCalcium PlantJacksonville24.8 mi49.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
UNDERWOOD STEPHANIE
Contractor
ALLIANCE GENERAL CONTRACTING
1 active project · Pasco

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251911662026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/alliance-general-contracting-project-25-25-19-pasco-fl-2078e5bb