Leads/allen-ronald-project-10-26-18-pasco-fl-53c1bc15
Active · clearingPasco County

ALLEN RONALD project — 10-26-18

10-26-18

Load estimate pending
Lifecycle
Active as of Mar 10, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

ALLEN RONALD project — 10-26-18

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
ALLEN RONALD
📞 (813) 737-9016
Developer / Applicant
ROSE SCOTT E
Why this is a hauling opportunity: NOC — unclassified description: 10-26-18 | Connector base: 50 | Stage = under_construction — actionable now (+10) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-11PASCO_NOC
    Captured Pasco_2026043794 from pasco_noc
  2. 2026-04-14PASCO_NOC
    Captured Pasco_2026067739 from pasco_noc
  3. 2026-05-08PASCO_NOC
    Captured Pasco_2026083346 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
10.3 mi
Round trip
20.7 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 10.3 mi20.7
quarryCentral State Aggregates LLCZephyrhill12.3 mi24.6
sand pitCounty Line MineSpring Hill14.3 mi28.6
quarryTampa Cement Grinding PlantTampa21.0 mi42
quarryBrooksville QuarryBrooksville24.1 mi48.3
quarryBrooksville South Cement PlantBrooksville24.5 mi49.1
quarryCalcium PlantJacksonville27.8 mi55.7
quarryWest Florida AggregateWebster28.8 mi57.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260437942026-03-11Open ↗
pasco_nocPasco_20260677392026-04-14Open ↗
pasco_nocPasco_20260833462026-05-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/allen-ronald-project-10-26-18-pasco-fl-53c1bc15