Leads/allen-rich-project-10-25-16-pasco-fl-721f4567
Approved · unknownPasco County

ALLEN RICH project — 10-25-16

10-25-16

~542loads
fill dirt + base rock
4 wk
Lifecycle
Active as of May 18, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

ALLEN RICH project — 10-25-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$4K
Actual — from source record
Acreage
3.9 ac
Parcel 10-25-16-0580-49900-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
ALLEN RICH
📞 (863) 294-7411
Developer / Applicant
PASCO COUNTY
Why this is a hauling opportunity: NOC — unclassified description: 10-25-16 | Connector base: 50 | Stage = under_construction — actionable now (+10) | size signal: 3.9 ac disturbed, ~542 est. loads (+20) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | size signal: 3.9 ac disturbed, ~542 est. loads (+20) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | size signal: 3.9 ac disturbed, ~542 est. loads (+20) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | size signal: 3.9 ac disturbed, ~542 est. loads (+20) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-19PASCO_NOC
    Captured Pasco_2026091941 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_10-25-16-0580-49900-0000_71fc6c99 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_10-25-16-0580-49900-0000_71fc6c99 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
10.6 mi
Round trip
21.2 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill10.6 mi21.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 13.0 mi26.1
quarryBrooksville QuarryBrooksville23.5 mi47
quarryBrooksville South Cement PlantBrooksville24.3 mi48.7
quarryCentral State Aggregates LLCZephyrhill25.5 mi50.9
quarryCalcium PlantJacksonville26.9 mi53.8
quarryTampa Cement Grinding PlantTampa30.7 mi61.5
quarryCenter Hill MineBrooksville31.0 mi61.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PASCO COUNTY
1 active project · Pasco
Pasco County, FL, USA
Contractor
ALLEN RICH
1 active project · Pasco
📞 (863) 294-7411

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260919412026-05-19Open ↗
fl_dor_cadastralFDOR_10-25-16-0580-49900-0000_71fc6c992026-05-28Open ↗
pascopaPASCOPA_10-25-16-0580-49900-0000_71fc6c992026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
10-25-16-0580-49900-0000
Strap
10-25-16-0580-49900-0000
Address
Acreage
3.9 ac
Sq ft
169,884
Owner of record
PASCO COUNTY
C/O FACILITIES MANAGEMENT DEPARTMENT
Last sale

No sale on record

Appraiser valuation
Just (market)
$3,900

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/allen-rich-project-10-25-16-pasco-fl-721f4567