AKVM CONSTRUCTION GROUP INC project — Sarasota County
5481 DOWNHAM MEADOWS
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
AKVM Construction Group is executing a site development earthwork project in Sarasota County at 5481 Downham Meadows with permits now issued—creating immediate hauling demand for excavation, grading, and material movement. The project scores 75/100 on hauling opportunity, indicating strong potential for soil export, fill delivery, and demolition waste removal during active site prep. Contact AKVM Construction Group directly as the prime GC and Charles Herbert Zanzinger as the developer to secure earthwork hauling contracts before work mobilization.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22SARASOTA_NOCCaptured Sarasota_2024118276 from sarasota_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Wingate Creek Mine | Lithia | 22.8 mi | 45.5 |
| quarry | Caloosa Materials | Ruskin | 23.6 mi | 47.3 |
| quarry | Florida Shell & Fill Company LLC | Naples | 29.6 mi | 59.2 |
| quarry | South Pasture Mine | Lithia | 37.1 mi | 74.1 |
| quarry | 4M-31 Mine | Alva | 38.3 mi | 76.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 39.7 mi | 79.4 |
| quarry | Four Corners | Lithia | 40.9 mi | 81.8 |
| sand pit | Washington Loop Mine | Punta Gorda | 41.6 mi | 83.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| sarasota_noc | Sarasota_2024118276 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Sarasota
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/akvm-construction-group-inc-project-sarasota-county-sarasota-fl-cb1d68ba