Leads/airport-taylor-rd-roadway-im-charlotte-fl-95c30133
Approved · unknownCharlotte County

AIRPORT & TAYLOR RD ROADWAY IM

AIRPORT & TAYLOR RD INTERSECTI, PUNTA GORDA, FL, 33950

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

AIRPORT & TAYLOR RD ROADWAY IM

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
AIRPORT & TAYLOR RD ROADWAY IM
Why this is a hauling opportunity: Base site_development/stormwater (40) | roadway/highway keywords (+25)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10BL96 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
6.2 mi
Round trip
12.3 mi
TypeNameCityOne-wayRT mi
sand pitWashington Loop MinePunta Gorda6.2 mi12.3
quarryBermont Materials AlicoPunta Gorda6.5 mi13
quarryHalls MineNaples15.9 mi31.8
quarryHighlands County Shell PitSebring17.6 mi35.3
quarryWright Farms PitNocatee17.8 mi35.6
quarryJayrockPunta Gorda17.9 mi35.7
sand pitWillliams Farms Sand & Shell, Inc.PUNTA GORDA18.0 mi36
sand pitWatermelon PitPunta Gorda18.0 mi36.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
AIRPORT & TAYLOR RD ROADWAY IM

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Charlotte County Permits
Port Charlotte Building Construction
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10BL962026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Charlotte
City
PUNTA GORDA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/airport-taylor-rd-roadway-im-charlotte-fl-95c30133