Leads/aicher-agnes-project-14-26-16-pasco-fl-82ec95bc
Approved · unknownPasco County

AICHER AGNES project — 14-26-16

14-26-16

~1.0kloads
fill dirt + base rock
7 wk
Lifecycle
Active as of May 11, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

AICHER AGNES project — 14-26-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
7.38 ac
Parcel 14-26-16-010B-00000-00B0
Est truck loads
Needs site plan parse
Sources seen
18
Public records referencing this job
General Contractor
UNLIMITED PLUMBING SERVICES
Developer / Applicant
AICHER AGNES
Why this is a hauling opportunity: NOC — unclassified description: 14-26-16 | Connector base: 50 | Stage = under_construction — actionable now (+10) | size signal: 7.4 ac disturbed, ~1025 est. loads (+20) | stage=under_construction, recent (+10) | size signal: 7.4 ac disturbed, ~1025 est. loads (+20) | stage=under_construction, recent (+10) | size signal: 7.4 ac disturbed, ~1025 est. loads (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-16PASCO_NOC
    Captured Pasco_2026087801 from pasco_noc
  2. 2026-05-21PASCO_NOC
    Captured Pasco_2026090182 from pasco_noc
  3. 2026-05-21PASCO_NOC
    Captured Pasco_2026074718 from pasco_noc
  4. 2026-05-21PASCO_NOC
    Captured Pasco_2025194859 from pasco_noc
  5. 2026-05-21PASCO_NOC
    Captured Pasco_2023133914 from pasco_noc
  6. 2026-05-21PASCO_NOC
    Captured Pasco_2022041597 from pasco_noc
  7. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_14-26-16-010B-00000-00B0_5e8b8774 from fl_dor_cadastral
  8. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_14-26-16-010B-00000-00B0_16dbd3c0 from fl_dor_cadastral
  9. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_14-26-16-010B-00000-00B0_a0f86076 from fl_dor_cadastral
  10. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_14-26-16-010B-00000-00B0_33925709 from fl_dor_cadastral
  11. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_14-26-16-010B-00000-00B0_57e26dbb from fl_dor_cadastral
  12. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_14-26-16-010B-00000-00B0_ebea1d44 from fl_dor_cadastral
  13. 2026-06-01PASCOPA
    Captured PASCOPA_14-26-16-010B-00000-00B0_5e8b8774 from pascopa
  14. 2026-06-08PASCOPA
    Captured PASCOPA_14-26-16-010B-00000-00B0_16dbd3c0 from pascopa
  15. 2026-06-08PASCOPA
    Captured PASCOPA_14-26-16-010B-00000-00B0_a0f86076 from pascopa
  16. 2026-06-08PASCOPA
    Captured PASCOPA_14-26-16-010B-00000-00B0_33925709 from pascopa
  17. 2026-06-08PASCOPA
    Captured PASCOPA_14-26-16-010B-00000-00B0_57e26dbb from pascopa
  18. 2026-06-08PASCOPA
    Captured PASCOPA_14-26-16-010B-00000-00B0_ebea1d44 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.8 mi
Round trip
31.6 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.8 mi31.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.9 mi31.8
quarryCentral State Aggregates LLCZephyrhill23.1 mi46.3
quarryTampa Cement Grinding PlantTampa24.4 mi48.8
quarryBrooksville QuarryBrooksville28.6 mi57.2
quarryBrooksville South Cement PlantBrooksville29.3 mi58.6
quarryCalcium PlantJacksonville32.2 mi64.4
quarryCenter Hill MineBrooksville35.7 mi71.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
AICHER AGNES
Contractor
UNLIMITED PLUMBING SERVICES
2 active projects · Hillsborough
~3 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260878012026-05-16Open ↗
pasco_nocPasco_20260901822026-05-21Open ↗
pasco_nocPasco_20260747182026-05-21Open ↗
pasco_nocPasco_20251948592026-05-21Open ↗
pasco_nocPasco_20231339142026-05-21Open ↗
pasco_nocPasco_20220415972026-05-21Open ↗
fl_dor_cadastralFDOR_14-26-16-010B-00000-00B0_5e8b87742026-05-28Open ↗
fl_dor_cadastralFDOR_14-26-16-010B-00000-00B0_16dbd3c02026-05-28Open ↗
fl_dor_cadastralFDOR_14-26-16-010B-00000-00B0_a0f860762026-05-28Open ↗
fl_dor_cadastralFDOR_14-26-16-010B-00000-00B0_339257092026-05-28Open ↗
fl_dor_cadastralFDOR_14-26-16-010B-00000-00B0_57e26dbb2026-05-28Open ↗
fl_dor_cadastralFDOR_14-26-16-010B-00000-00B0_ebea1d442026-05-28Open ↗
pascopaPASCOPA_14-26-16-010B-00000-00B0_5e8b87742026-06-01Open ↗
pascopaPASCOPA_14-26-16-010B-00000-00B0_16dbd3c02026-06-08Open ↗
pascopaPASCOPA_14-26-16-010B-00000-00B0_a0f860762026-06-08Open ↗
pascopaPASCOPA_14-26-16-010B-00000-00B0_339257092026-06-08Open ↗
pascopaPASCOPA_14-26-16-010B-00000-00B0_57e26dbb2026-06-08Open ↗
pascopaPASCOPA_14-26-16-010B-00000-00B0_ebea1d442026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
14-26-16-010B-00000-00B0
Strap
14-26-16-010B-00000-00B0
Address
Acreage
7.38 ac
Sq ft
321,473
Owner of record
CYPRESS LAKES HOMEOWNERS
ASSOCIATION OF PASCO INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/aicher-agnes-project-14-26-16-pasco-fl-82ec95bc