AG EHC II LEN MULTI STATE 4 LLC project — 21-26-21
21-26-21
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-04-28PASCO_NOCCaptured Pasco_2026076590 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076591 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076592 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076593 from pasco_noc
- 2026-05-07PASCO_NOCCaptured Pasco_2026085005 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026085006 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026085007 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026085008 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026085009 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026085010 from pasco_noc
- 2026-05-16PASCO_NOCCaptured Pasco_2026090475 from pasco_noc
- 2026-05-16PASCO_NOCCaptured Pasco_2026090476 from pasco_noc
- 2026-05-16PASCO_NOCCaptured Pasco_2026090477 from pasco_noc
- 2026-05-16PASCO_NOCCaptured Pasco_2026090478 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 5.0 mi | 10.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 20.9 mi | 41.8 |
| quarry | West Florida Aggregate | Webster | 21.2 mi | 42.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 23.4 mi | 46.8 |
| sand pit | County Line Mine | Spring Hill | 26.7 mi | 53.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 29.2 mi | 58.5 |
| quarry | Brooksville Quarry | Brooksville | 29.5 mi | 58.9 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 29.9 mi | 59.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026076590 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026076591 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026076592 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026076593 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026085005 | 2026-05-07 | Open ↗ |
| pasco_noc | Pasco_2026085006 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026085007 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026085008 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026085009 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026085010 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026090475 | 2026-05-16 | Open ↗ |
| pasco_noc | Pasco_2026090476 | 2026-05-16 | Open ↗ |
| pasco_noc | Pasco_2026090477 | 2026-05-16 | Open ↗ |
| pasco_noc | Pasco_2026090478 | 2026-05-16 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/ag-ehc-ii-len-multistate-4-llc-project-21-26-21-pasco-fl-7ffc2b34