AG EHC II LEN MULTI STATE 4 LLC project — 12-25-19
12-25-19
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-29PASCO_NOCCaptured Pasco_2026057051 from pasco_noc
- 2026-04-01PASCO_NOCCaptured Pasco_2026058100 from pasco_noc
- 2026-04-01PASCO_NOCCaptured Pasco_2026058228 from pasco_noc
- 2026-04-01PASCO_NOCCaptured Pasco_2026058229 from pasco_noc
- 2026-04-14PASCO_NOCCaptured Pasco_2026067556 from pasco_noc
- 2026-04-25PASCO_NOCCaptured Pasco_2026075592 from pasco_noc
- 2026-04-25PASCO_NOCCaptured Pasco_2026075593 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076582 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076583 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076584 from pasco_noc
- 2026-04-28PASCO_NOCCaptured Pasco_2026076585 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 8.9 mi | 17.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 9.2 mi | 18.4 |
| sand pit | County Line Mine | Spring Hill | 14.7 mi | 29.4 |
| quarry | Brooksville Quarry | Brooksville | 18.6 mi | 37.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 18.6 mi | 37.2 |
| quarry | West Florida Aggregate | Webster | 18.7 mi | 37.5 |
| quarry | Calcium Plant | Jacksonville | 21.9 mi | 43.8 |
| quarry | Center Hill Mine | Brooksville | 22.4 mi | 44.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026057051 | 2026-03-29 | Open ↗ |
| pasco_noc | Pasco_2026058100 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026058228 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026058229 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026067556 | 2026-04-14 | Open ↗ |
| pasco_noc | Pasco_2026075592 | 2026-04-25 | Open ↗ |
| pasco_noc | Pasco_2026075593 | 2026-04-25 | Open ↗ |
| pasco_noc | Pasco_2026076582 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026076583 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026076584 | 2026-04-28 | Open ↗ |
| pasco_noc | Pasco_2026076585 | 2026-04-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/ag-ehc-ii-len-multi-state-4-llc-project-12-25-19-pasco-fl-aea19779