AG EHC II LEN MULTI STATE 4 LLC project — 01-25-19
01-25-19
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-04-01PASCO_NOCCaptured Pasco_2026058230 from pasco_noc
- 2026-04-01PASCO_NOCCaptured Pasco_2026058231 from pasco_noc
- 2026-04-01PASCO_NOCCaptured Pasco_2026058232 from pasco_noc
- 2026-04-01PASCO_NOCCaptured Pasco_2026058233 from pasco_noc
- 2026-04-14PASCO_NOCCaptured Pasco_2026067557 from pasco_noc
- 2026-04-14PASCO_NOCCaptured Pasco_2026067558 from pasco_noc
- 2026-04-14PASCO_NOCCaptured Pasco_2026067559 from pasco_noc
- 2026-04-14PASCO_NOCCaptured Pasco_2026067560 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 8.5 mi | 16.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 10.1 mi | 20.2 |
| sand pit | County Line Mine | Spring Hill | 14.2 mi | 28.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 17.6 mi | 35.2 |
| quarry | Brooksville Quarry | Brooksville | 17.6 mi | 35.2 |
| quarry | West Florida Aggregate | Webster | 18.1 mi | 36.2 |
| quarry | Calcium Plant | Jacksonville | 20.9 mi | 41.8 |
| quarry | Center Hill Mine | Brooksville | 21.4 mi | 42.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026058230 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026058231 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026058232 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026058233 | 2026-04-01 | Open ↗ |
| pasco_noc | Pasco_2026067557 | 2026-04-14 | Open ↗ |
| pasco_noc | Pasco_2026067558 | 2026-04-14 | Open ↗ |
| pasco_noc | Pasco_2026067559 | 2026-04-14 | Open ↗ |
| pasco_noc | Pasco_2026067560 | 2026-04-14 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/ag-ehc-ii-len-multi-state-4-llc-project-01-25-19-pasco-fl-ae3b1b4b