Approved · unknownMONROE County
Cleanup (petroleum cleanup) — LAYTON GARAGE
68650 OVERSEAS HWY, LAYTON, FL, 33001
Load estimate pending
Lifecycle
Permitted as of Jul 3, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — LAYTON GARAGE
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation status. Environmental data point, not an active construction lead; kept for enrichment/adjacency context only.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-04FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88167159 from fdep_cleanup_sites
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
LONG KEY TRANSFER STATION · Long Key
One-way
0.5 mi
Round trip
1 mi
Closest import source (quarry)
SDI Aggregates LLC · Fort Myers
One-way
46.9 mi
Round trip
93.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | SDI Aggregates LLC | Fort Myers | 46.9 mi | 93.8 |
| transfer station | LONG KEY TRANSFER STATION | Long Key | 0.5 mi | 1 |
| transfer station | MARATHON TRANSFER STATION | Marathon | 15.7 mi | 31.4 |
| transfer station | ATLANTIC TRASH AND TRANSFER | Key Largo | 30.5 mi | 60.9 |
| landfill | KEY LARGO TRANSFER STATION AND CLOSED LANDFILL | Key Largo | 41.7 mi | 83.3 |
| landfill | CUDJOE KEY LANDFILL | Cudjoe Key | 44.8 mi | 89.7 |
| quarry | Windley Quarry | — | 16.1 mi | 32.2 |
| quarry | Flagler Quarry | — | 16.2 mi | 32.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_88167159 | 2026-07-04 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- MONROE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/af72bf07