Approved · unknownLEON County
Cleanup (petroleum cleanup) — LOCKE HEATING & AIR CONDITIONING
700 BLOUNTSTOWN ST, TALLAHASSEE, FL, 32304
Load estimate pending
Lifecycle
Active as of Jun 11, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — LOCKE HEATING & AIR CONDITIONING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$374K
Actual — from source record
Acreage
—
Parcel 2132200070000
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: (+5) | stage=under_construction, recent (+10) | single-trade residential permit — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87939405 from fdep_cleanup_sites
- 2026-06-21FL_DOR_CADASTRALCaptured FDOR_2132200070000_ae4383c0 from fl_dor_cadastral
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
LEON COUNTY SOLID WASTE TRANSFER STATION · Tallahassee
One-way
0.8 mi
Round trip
1.7 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
4.5 mi
Round trip
8.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 4.5 mi | 8.9 |
| quarry | Active Minerals Attapulgite Division | Quincy | 17.0 mi | 33.9 |
| quarry | Quincy Plant and Mines | QUINCY | 17.2 mi | 34.4 |
| sand pit | A-Mining Group II LLC. | Quincy | 18.1 mi | 36.3 |
| quarry | CYD Cabbage Grove | Daytona Beach | 30.5 mi | 61.1 |
| quarry | Perry Quarry | Fort Myers | 30.8 mi | 61.6 |
| transfer station | LEON COUNTY SOLID WASTE TRANSFER STATION | Tallahassee | 0.8 mi | 1.7 |
| landfill | WELDONS LANDFILL | Tallahassee | 1.8 mi | 3.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87939405 | 2026-06-11 | Open ↗ |
| fl_dor_cadastral | FDOR_2132200070000_ae4383c0 | 2026-06-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 2132200070000
- County
- LEON
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/ae4383c0