ADVANCED BUILDING CONSTRUCTION LLC project — 13-26-20
13-26-20
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
**Advanced Building Construction Site Development Project** Advanced Building Construction LLC is actively developing a site at 13-26-20 with strong near-term hauling potential (75/100 score), likely requiring earthwork, grading, and material movement typical of site development phases. With the project currently under construction, there's immediate opportunity for debris removal, fill material, and excavation transport services. Contact Prime GC Awad Maikel at (813) 754-4611 or owner/developer Advanced Building Construction LLC at (727) 967-6553 to discuss hauling and transportation needs.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-04-07PASCO_NOCCaptured Pasco_2026060987 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 2.4 mi | 4.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 17.9 mi | 35.8 |
| quarry | West Florida Aggregate | Webster | 21.2 mi | 42.3 |
| quarry | Tampa Cement Grinding Plant | Tampa | 22.6 mi | 45.2 |
| sand pit | County Line Mine | Spring Hill | 23.7 mi | 47.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.1 mi | 54.2 |
| quarry | Brooksville Quarry | Brooksville | 27.3 mi | 54.5 |
| quarry | Center Hill Mine | Brooksville | 29.8 mi | 59.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026060987 | 2026-04-07 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/advanced-building-construction-llc-project-13-26-20-pasco-fl-890b9f3d