Leads/acosta-alonso-yosmary-project-22-25-16-pasco-fl-0dfe5fe8
Active · clearingPasco County

ACOSTA ALONSO YOSMARY project — 22-25-16

22-25-16

Load estimate pending
Lifecycle
Active as of Mar 26, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

ACOSTA ALONSO YOSMARY project — 22-25-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
GONZALEZ JORGE
📞 (305) 672-9333
Developer / Applicant
ACOSTA ALONSO YOSMARY
Why this is a hauling opportunity: NOC — unclassified description: 22-25-16 | Connector base: 50 | Stage = under_construction — actionable now (+10) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low | stage=under_construction, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-29PASCO_NOC
    Captured Pasco_2026056260 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
12.1 mi
Round trip
24.2 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill12.1 mi24.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 13.8 mi27.7
quarryCentral State Aggregates LLCZephyrhill24.9 mi49.8
quarryBrooksville QuarryBrooksville25.1 mi50.1
quarryBrooksville South Cement PlantBrooksville25.9 mi51.7
quarryCalcium PlantJacksonville28.5 mi57.1
quarryTampa Cement Grinding PlantTampa29.0 mi58
quarryCenter Hill MineBrooksville32.4 mi64.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
GONZALEZ JORGE
3 active projects · Pasco
📞 (305) 672-9333

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260562602026-03-29Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/acosta-alonso-yosmary-project-22-25-16-pasco-fl-0dfe5fe8