ABRAMS GROUP CONSTRUCTION project — 26-26-17
26-26-17
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
ABRAMS GROUP CONSTRUCTION is undertaking earthwork site development at 26-26-17 with permits now issued, creating immediate hauling opportunities for soil excavation, fill material transport, and site grading operations. The project scores 75/100 for hauling providers, indicating strong demand potential given the earthwork focus and current permitting stage. Contact ABRAMS GROUP CONSTRUCTION directly at (850) 994-7980 to discuss material handling and equipment needs, or reach out to U HAUL CO OF FLORIDA as the project owner.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025135561 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 14.3 mi | 28.6 |
| sand pit | County Line Mine | Spring Hill | 16.5 mi | 32.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 17.1 mi | 34.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.6 mi | 39.2 |
| quarry | Brooksville Quarry | Brooksville | 28.1 mi | 56.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 28.6 mi | 57.2 |
| quarry | Calcium Plant | Jacksonville | 31.8 mi | 63.6 |
| quarry | West Florida Aggregate | Webster | 34.5 mi | 69 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025135561 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/abrams-group-construction-project-26-26-17-pasco-fl-06acc6c8