Leads/abrams-group-construction-project-26-26-17-pasco-fl-06acc6c8
Approved · unknownPasco County

ABRAMS GROUP CONSTRUCTION project — 26-26-17

26-26-17

Load estimate pending
Lifecycle
Permitted as of Jul 15, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ABRAMS GROUP CONSTRUCTION project — 26-26-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
ABRAMS GROUP CONSTRUCTION
📞 (850) 994-7980
Developer / Applicant
U HAUL CO OF FLORIDA
The story

ABRAMS GROUP CONSTRUCTION is undertaking earthwork site development at 26-26-17 with permits now issued, creating immediate hauling opportunities for soil excavation, fill material transport, and site grading operations. The project scores 75/100 for hauling providers, indicating strong demand potential given the earthwork focus and current permitting stage. Contact ABRAMS GROUP CONSTRUCTION directly at (850) 994-7980 to discuss material handling and equipment needs, or reach out to U HAUL CO OF FLORIDA as the project owner.

Why this is a hauling opportunity: General contractor NOC: ABRAMS GROUP CONSTRUCTION | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025135561 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
14.3 mi
Round trip
28.6 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 14.3 mi28.6
sand pitCounty Line MineSpring Hill16.5 mi32.9
quarryCentral State Aggregates LLCZephyrhill17.1 mi34.2
quarryTampa Cement Grinding PlantTampa19.6 mi39.2
quarryBrooksville QuarryBrooksville28.1 mi56.2
quarryBrooksville South Cement PlantBrooksville28.6 mi57.2
quarryCalcium PlantJacksonville31.8 mi63.6
quarryWest Florida AggregateWebster34.5 mi69
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
U HAUL CO OF FLORIDA
Hauler
2311 ANGEL OLIVA SENIOR ST. C/O U-HAUL INTERNATIONAL TAMPA, FL 33605
People (1)
  • ROBERT S · PD MAGYAR
Contractor
ABRAMS GROUP CONSTRUCTION
2 active projects · Pasco
📞 (850) 994-7980

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251355612026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/abrams-group-construction-project-26-26-17-pasco-fl-06acc6c8