Leads/ab16d9a3
Approved · planning

MEDARD CAMPGROUND IMPROVEMENTS

6140 TURKEY CREEK RD, PLANT CITY, FL, 33567

Load estimate pending
Lifecycle
Permitted as of Jan 29, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

MEDARD CAMPGROUND IMPROVEMENTS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/29/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
HILLSBOROUGH COUNTY
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0445997-001-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Four Corners · Lithia
One-way
16.3 mi
Round trip
32.6 mi
TypeNameCityOne-wayRT mi
quarryFour CornersLithia16.3 mi32.6
quarryTampa Cement Grinding PlantTampa17.2 mi34.4
quarryCentral State Aggregates LLCZephyrhill20.6 mi41.3
quarryCaloosa MaterialsRuskin23.2 mi46.3
quarrySouth Pasture MineLithia23.5 mi47.1
quarryWingate Creek MineLithia29.8 mi59.7
quarrySouth Fort Meade MineLithia31.5 mi63
sand pitGator Sand MineBrooksville37.0 mi74
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
HILLSBOROUGH COUNTY
Hillsborough County, FL, USA

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0445997-001-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/ab16d9a3