Approved · unknownDuval County
FDOT — SR228(NORMANDY BLVD) @ I-295(SR9A) OPERATIONAL IMPROVEMENTS - INTERCHANGE IMPROVEMENT
Duval County — FDOT Contract T2904
Load estimate pending
Lifecycle
Completed as of Aug 2, 2023
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR228(NORMANDY BLVD) @ I-295(SR9A) OPERATIONAL IMPROVEMENTS - INTERCHANGE IMPROVEMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$3.2M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — SR228(NORMANDY BLVD) @ I-295(SR9A) OPERATIONAL IMPROVEMENTS - INTERCHANGE IMPROV. Vendor: HUBBARD CONSTRUCTION COMPANY. Cost: $3,240,819. | FDOT public project (+15) | size signal: $3,240,819 valuation (+12) | FDOT public project (+15) | size signal: $3,240,819 valuation (+12) | FDOT public project (+15) | size signal: $3,240,819 valuation (+12) | FDOT public project (+15) | size signal: $3,240,819 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T2904_4 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
WHITEHOUSE RECYCLING (A/K/A COXWELL MRF) · Jacksonville
One-way
3.9 mi
Round trip
7.8 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
14.0 mi
Round trip
28 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Dames Point Terminal | Brooksville | 14.0 mi | 28 |
| quarry | The Chemours Company FC LLC | Starke | 30.6 mi | 61.1 |
| sand pit | Goldhead Sand Plant | Jacksonville | 34.6 mi | 69.1 |
| sand pit | Grandin Sand Plant | Jacksonville | 40.3 mi | 80.7 |
| quarry | SRM Materials East Palatka | Murfresboro | 44.7 mi | 89.3 |
| sand pit | Keuka Sand Plant | Jacksonville | 47.7 mi | 95.3 |
| quarry | Edgar Minerals, Inc. | Davenport | 49.5 mi | 99 |
| transfer station | WHITEHOUSE RECYCLING (A/K/A COXWELL MRF) | Jacksonville | 3.9 mi | 7.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T2904_4 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Duval
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/a8829895