Leads/a836bfc8
Approved · planning

RUNNELS CANOPIES

4355 POMPANO LN, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
Permitted as of Oct 28, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

RUNNELS CANOPIES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 10/28/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
WARREN RUNNELS
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0136995-002-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
8.4 mi
Round trip
16.7 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.8 mi
Round trip
31.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin15.8 mi31.6
quarryTampa Cement Grinding PlantTampa29.7 mi59.3
quarryWingate Creek MineLithia30.2 mi60.3
quarrySouth Pasture MineLithia41.5 mi83
quarryFour CornersLithia42.4 mi84.9
quarryFlorida Shell & Fill Company LLCNaples43.9 mi87.8
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton8.4 mi16.7
landfillLENA RD COUNTY LFBradenton11.3 mi22.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
WARREN RUNNELS

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0136995-002-EG2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/a836bfc8