Approved · unknownAlachua County
FDOT — SR45(US27) FROM NORTH OF SR26(W NEWBERRY RD) TO SR25(US441) - RESURFACING
Alachua County — FDOT Contract T2A41
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
FDOT — SR45(US27) FROM NORTH OF SR26(W NEWBERRY RD) TO SR25(US441) - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$7.2M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR45(US27) FROM NORTH OF SR26(W NEWBERRY RD) TO SR25(US441) - RESURFACING. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $7,201,600. | FDOT public project (+15) | size signal: $7,201,600 valuation (+20) | FDOT public project (+15) | size signal: $7,201,600 valuation (+20) | FDOT public project (+15) | size signal: $7,201,600 valuation (+20) | FDOT public project (+15) | size signal: $7,201,600 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T2A41_3 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
LIMESTONE PRODUCTS INCORPORATED · NEWBERRY
One-way
7.3 mi
Round trip
14.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | LIMESTONE PRODUCTS INCORPORATED | NEWBERRY | 7.3 mi | 14.6 |
| quarry | NEWBERRY MINE- LIMESTONE MATERIALS | Ocala | 8.7 mi | 17.4 |
| quarry | NEWBERRY LIMESTONE | Ocala | 8.7 mi | 17.5 |
| quarry | Newberry Cement Plant | Newberry | 9.6 mi | 19.2 |
| quarry | TOWNSEND PIT | Bell | 16.4 mi | 32.9 |
| quarry | Suwannee American Cement | Branford | 18.4 mi | 36.9 |
| quarry | SUWANNEE AMERICAN CEMENT | Branford | 18.4 mi | 36.9 |
| quarry | SUWANNEE COUNTY PUBLIC WORKS | LIVE OAK | 20.0 mi | 40 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T2A41_3 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Alachua
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/a4e7d109