Leads/a4ceb4d8
Approved · unknown

FDOT — TRAFFIC OPS TRAFFIC OPS IMPROVEMENT

FL County — FDOT Contract E3G78-R0

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FDOT — TRAFFIC OPS TRAFFIC OPS IMPROVEMENT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$830K
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — TRAFFIC OPS TRAFFIC OPS IMPROVEMENT. Vendor: PANHANDLE GRADING & PAVING, INC.. Cost: $829,932. | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: $829,932 valuation (+5) | FDOT public project (+15) | size signal: $829,932 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E3G78-R0_7 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
USA Calcium · Marianna
One-way
2.1 mi
Round trip
4.3 mi
TypeNameCityOne-wayRT mi
sand pitUSA CalciumMarianna2.1 mi4.3
quarryMarianna Hi-Cal / Alternative MaterialsIrving2.2 mi4.5
quarryImperial Rock MineMarianna8.7 mi17.5
quarryJones PitChiefland9.7 mi19.4
quarryROCKY CREEK MINE AND MILLMarianna9.9 mi19.9
quarry1874 MariannaHammond10.8 mi21.7
sand pitPanama City QuarryMurfresboro24.8 mi49.6
sand pitSandhills Plant 2Dothan35.2 mi70.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E3G78-R0_72026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/a4ceb4d8