Cypress Ridge Subdivision Phase 3 ERP Modification
Bishop Road and C.R. 579, Wimauma, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/23/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24SWFWMD_ERPCaptured SWFWMD_ERP_932637 from swfwmd_erp
- 2026-05-24SWFWMD_ERP_PLANSCaptured SWFWMD_PLANS_932637_a42b2152 from swfwmd_erp_plans
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
- multiple wet detention/retention ponds (Pond 2
- Pond 3
- Pond 4
- Pond 5
- Pond 6
- Pond 8
- Pond 9
- Pond 10
- Pond 11
- Floodplain Mitigation Ponds 1-4
- labeled on aerial and drainage plans)
- roadway swales
- curb inlets (curb inlet types I
- II
- III shown on drainage details)
- mitered end sections
- outfall sumps
- ditch bottom inlets (types C
- D
- E
- H)
- storm drainage structures (numerous RCP structures listed in storm structure data table on sheet 21)
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 8.6 mi | 17.3 |
| quarry | Tampa Cement Grinding Plant | Tampa | 17.7 mi | 35.4 |
| quarry | Wingate Creek Mine | Lithia | 18.3 mi | 36.6 |
| quarry | Four Corners | Lithia | 20.4 mi | 40.8 |
| quarry | South Pasture Mine | Lithia | 22.0 mi | 44 |
| quarry | South Fort Meade Mine | Lithia | 33.6 mi | 67.2 |
| quarry | Central State Aggregates LLC | Zephyrhill | 33.9 mi | 67.8 |
| quarry | 4M-31 Mine | Alva | 43.9 mi | 87.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_932637 | 2026-05-24 | Open ↗ |
| swfwmd_erp_plans | SWFWMD_PLANS_932637_a42b2152 | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 079672.0100, 079672.0125, 079672.0350, 079672.0400, 079672.0500
- City
- Wimauma