Leads/a-c-guy-of-tampa-bay-project-32-26-17-pasco-fl-f6d29808
Approved · unknownPasco County

A C GUY OF TAMPA BAY project — 32-26-17

32-26-17

~6.1kloads
fill dirt + base rock
~9 mo
Lifecycle
Active as of May 11, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

A C GUY OF TAMPA BAY project — 32-26-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
44.03 ac
Parcel 32-26-17-0000-00100-0027
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
A C GUY OF TAMPA BAY
📞 (727) 286-3170
Developer / Applicant
BURDICK BARBARA
Why this is a hauling opportunity: NOC — unclassified description: 32-26-17 | Connector base: 50 | Stage = under_construction — actionable now (+10) | size signal: 44 ac disturbed, ~6115 est. loads (+25) | stage=under_construction, recent (+10) | size signal: 44 ac disturbed, ~6115 est. loads (+25) | stage=under_construction, recent (+10) | size signal: 44 ac disturbed, ~6115 est. loads (+25) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-16PASCO_NOC
    Captured Pasco_2026087197 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_32-26-17-0000-00100-0027_6f2db551 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_32-26-17-0000-00100-0027_6f2db551 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
16.5 mi
Round trip
33 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 16.5 mi33
sand pitCounty Line MineSpring Hill17.8 mi35.6
quarryCentral State Aggregates LLCZephyrhill20.2 mi40.4
quarryTampa Cement Grinding PlantTampa20.2 mi40.4
quarryBrooksville QuarryBrooksville30.0 mi60
quarryBrooksville South Cement PlantBrooksville30.6 mi61.2
quarryCalcium PlantJacksonville33.7 mi67.4
quarryCaloosa MaterialsRuskin34.8 mi69.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
BURDICK BARBARA
1 active project · Pasco
Contractor
A C GUY OF TAMPA BAY
2 active projects · Pasco
~6,115 est. loads · fill dirt
📞 (727) 286-3170

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260871972026-05-16Open ↗
fl_dor_cadastralFDOR_32-26-17-0000-00100-0027_6f2db5512026-05-28Open ↗
pascopaPASCOPA_32-26-17-0000-00100-0027_6f2db5512026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
32-26-17-0000-00100-0027
Strap
32-26-17-0000-00100-0027
Address
1823 LAKESTONE DRIVE, NEW PORT RICHEY
Zip
34655
Acreage
44.03 ac
Sq ft
1,917,947
Owner of record
HERITAGE SPRINGS COMMUNITY
ASSOCIATION INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$553,395

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/a-c-guy-of-tampa-bay-project-32-26-17-pasco-fl-f6d29808