Leads/9ca82212
Approved · planningHillsborough County

KAREMPELIS PETER FKA ROTHMAN

18045 WAYNE ROAD, ODESSA, FL, 33556

~61loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Feb 14, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

KAREMPELIS PETER FKA ROTHMAN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/14/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$2.2M
Actual — from source record
Acreage
0.549 ac
Parcel 0012830204
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
J FOSTER CONSULTING
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $2,177,214 valuation, ~61 est. loads (+12) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0455269-001-EI from fdep_erp
  2. 2026-06-23FL_DOR_CADASTRAL
    Captured FDOR_17271500V000000000020U_9ca82212 from fl_dor_cadastral
  3. 2026-06-23HCPA
    Captured HCPA_0012830204_9ca82212 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
16.5 mi
Round trip
33 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa16.5 mi33
quarryGeorgia Stone Spring Hill QuarryAtlanta 18.0 mi36
quarryCentral State Aggregates LLCZephyrhill18.2 mi36.3
sand pitCounty Line MineSpring Hill20.3 mi40.5
quarryCaloosa MaterialsRuskin31.4 mi62.8
quarryBrooksville QuarryBrooksville31.8 mi63.7
quarryBrooksville South Cement PlantBrooksville32.4 mi64.7
quarryCalcium PlantJacksonville35.6 mi71.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
J FOSTER CONSULTING

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - Individual With No Conceptual Approval Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0455269-001-EI2026-05-24Open ↗
fl_dor_cadastralFDOR_17271500V000000000020U_9ca822122026-06-23Open ↗
hcpaHCPA_0012830204_9ca822122026-06-23Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0012830204
Strap
U-15-27-17-00V-000000-00002.0
Address
18045 WAYNE RD, ODESSA
Zip
33556
Acreage
0.549 ac
Sq ft
23,912
Homestead
YES
Owner of record
KAREMPELIS PETER
KAREMPELIS RYAN
Last sale
2024-06-10
$2,999,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/9ca82212