Leads/9a9a7721
Approved · unknown

FDOT — I-4/SR-400 FROM SR-482/SAND LAKE ROAD TO NORTH OF THE SEMINO LE COUNTY - OTHER ITS

FL County — FDOT Contract T5807

Load estimate pending
Lifecycle
Completed as of May 22, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — I-4/SR-400 FROM SR-482/SAND LAKE ROAD TO NORTH OF THE SEMINO LE COUNTY - OTHER ITS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$5.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT utilities contract — I-4/SR-400 FROM SR-482/SAND LAKE ROAD TO NORTH OF THE SEMINO LE COUNTY - OTHER I. Vendor: HIGHWAY SAFETY DEVICES, INC. Cost: $5,376,805. | FDOT public project (+15) | size signal: $5,376,805 valuation (+20) | FDOT public project (+15) | size signal: $5,376,805 valuation (+20) | FDOT public project (+15) | size signal: $5,376,805 valuation (+20) | FDOT public project (+15) | size signal: $5,376,805 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T5807_2 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
18.7 mi
Round trip
37.4 mi
TypeNameCityOne-wayRT mi
sand pitCenter Sand CompanyClermont18.7 mi37.4
sand pitIndependent MineDavenport19.4 mi38.8
sand pitFour Corners Sand MineBrooksville19.6 mi39.1
quarryS & L Materials IncKISSIMMEE22.5 mi45
sand pitHilochee Sand MineDavenport22.6 mi45.1
quarryBeeline MineOrlando23.6 mi47.1
sand pitCypress SandLexington23.7 mi47.3
sand pitLake Sand PlantJacksonville24.0 mi48
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T5807_22026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/9a9a7721