Approved · planningHillsborough County

BAYSIDE POWER STATION BESS

3602 PORT SUTTON ROAD, TAMPA, FL, 33619

~1.3kloads
fill dirt
9 wk
Lifecycle
Permitted as of Dec 6, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

BAYSIDE POWER STATION BESS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/6/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$20.8M
Actual — from source record
Acreage
11.953 ac
Parcel 0489520000
Est truck loads
Needs site plan parse
Sources seen
8
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
TAMPA ELECTRIC COMPANY
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 12 ac disturbed, $20,845,697 valuation, ~1328 est. loads (+25) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0180680-012-EM from fdep_erp
  2. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0180680-012-EM from fdep_spgp
  3. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0176089-006-EE from fdep_spgp
  4. 2026-05-29HCPA
    Captured HCPA_0489520000_d0832058 from hcpa
  5. 2026-05-29HCPA
    Captured HCPA_0489520000_328a4ae9 from hcpa
  6. 2026-06-03FL_DOR_CADASTRAL
    Captured FDOR_193004ZZZ000001673600U_d0832058 from fl_dor_cadastral
  7. 2026-06-23FL_DOR_CADASTRAL
    Captured FDOR_193004ZZZ000001673600U_992039b2 from fl_dor_cadastral
  8. 2026-06-23HCPA
    Captured HCPA_0489520000_992039b2 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.7 mi
Round trip
5.4 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa2.7 mi5.4
quarryCaloosa MaterialsRuskin14.2 mi28.5
quarryCentral State Aggregates LLCZephyrhill21.6 mi43.3
quarryFour CornersLithia28.7 mi57.4
quarryWingate Creek MineLithia33.3 mi66.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 33.4 mi66.8
quarrySouth Pasture MineLithia33.6 mi67.2
sand pitCounty Line MineSpring Hill37.5 mi75
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
TAMPA ELECTRIC COMPANY
3600 Midtown Drive TAMPA, FL 33607
People (1)
  • JARED GREEN · T, CFO

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Modifications))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0180680-012-EM2026-05-24Open ↗
fdep_spgpFDEP_SPGP_0180680-012-EM2026-05-28Open ↗
fdep_spgpFDEP_SPGP_0176089-006-EE2026-05-28Open ↗
hcpaHCPA_0489520000_d08320582026-05-29Open ↗
hcpaHCPA_0489520000_328a4ae92026-05-29Open ↗
fl_dor_cadastralFDOR_193004ZZZ000001673600U_d08320582026-06-03Open ↗
fl_dor_cadastralFDOR_193004ZZZ000001673600U_992039b22026-06-23Open ↗
hcpaHCPA_0489520000_992039b22026-06-23Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0489520000
Strap
U-04-30-19-ZZZ-000001-67360.0
Address
3602 PORT SUTTON RD, TAMPA
Zip
33619
Acreage
11.953 ac
Sq ft
520,691
Homestead
NO
Owner of record
TAMPA ELECTRIC CO
Last sale
1985-11-01
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/992039b2