Leads/96591c48
Approved · unknown

FDOT — FIRST COAST EXPRESSWAY SAFETY ENHANCEMENTS (CLAY & DUVAL)(MP 31-MP45.7) - SAFETY PROJECT

FL County — FDOT Contract E8V11

Load estimate pending
Lifecycle
Active as of Jul 7, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — FIRST COAST EXPRESSWAY SAFETY ENHANCEMENTS (CLAY & DUVAL)(MP 31-MP45.7) - SAFETY PROJECT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$8.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT earthwork contract — FIRST COAST EXPRESSWAY SAFETY ENHANCEMENTS (CLAY & DUVAL)(MP 31-MP45.7) - SAFETY. Vendor: AMERICAN LIGHTING AND SIGNALIZATION, LLC.. Cost: $8,384,255. | FDOT public project (+15) | size signal: $8,384,255 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,384,255 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,384,255 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E8V11_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
WHITEHOUSE RECYCLING (A/K/A COXWELL MRF) · Jacksonville
One-way
4.7 mi
Round trip
9.3 mi
Closest import source (quarry)
Dames Point Terminal · Brooksville
One-way
19.6 mi
Round trip
39.2 mi
TypeNameCityOne-wayRT mi
quarryDames Point TerminalBrooksville19.6 mi39.2
quarryThe Chemours Company FC LLCStarke25.2 mi50.3
sand pitGoldhead Sand PlantJacksonville29.9 mi59.8
sand pitGrandin Sand PlantJacksonville36.1 mi72.3
quarrySRM Materials East PalatkaMurfresboro43.2 mi86.4
sand pitKeuka Sand PlantJacksonville43.6 mi87.2
quarryEdgar Minerals, Inc.Davenport45.4 mi90.7
transfer stationWHITEHOUSE RECYCLING (A/K/A COXWELL MRF)Jacksonville4.7 mi9.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E8V11_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/96591c48