Approved · unknownCITRUS County
Cleanup (petroleum cleanup) — HOMOSASSA SEAFOOD
11249 W SEMINOLE PL, HOMOSASSA, FL, 34448
Load estimate pending
Lifecycle
Permitted as of Jul 3, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — HOMOSASSA SEAFOOD
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation status. Environmental data point, not an active construction lead; kept for enrichment/adjacency context only.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-04FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88168928 from fdep_cleanup_sites
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Lecanto Mine · Crystal River
One-way
8.4 mi
Round trip
16.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Lecanto Mine | Crystal River | 8.4 mi | 16.8 |
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 8.4 mi | 16.8 |
| quarry | Maylen Mine | Crystal River | 9.4 mi | 18.7 |
| quarry | Red Level Mine | Crystal River | 12.6 mi | 25.2 |
| quarry | Calcium Plant | Jacksonville | 15.5 mi | 31 |
| quarry | Inglis Quarry | Brooksville | 16.4 mi | 32.9 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 17.2 mi | 34.5 |
| quarry | Brooksville Quarry | Brooksville | 17.4 mi | 34.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_88168928 | 2026-07-04 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- CITRUS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/937468ec