OWP - BRSPS PHASE 1 EW
12104 672 HWY, RIVERVIEW, FL, 33579
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 12/8/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24FDEP_ERPCaptured FDEP_ERP_0461344-002-EI from fdep_erp
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_203122ZZZ000003166200U_9221e5c2 from fl_dor_cadastral
- 2026-05-28FDEP_SPGPCaptured FDEP_SPGP_0461344-001-EI from fdep_spgp
- 2026-05-28FDEP_SPGPCaptured FDEP_SPGP_0461344-002-EI from fdep_spgp
- 2026-05-29HCPACaptured HCPA_0778000000_9221e5c2 from hcpa
- 2026-05-29HCPACaptured HCPA_0778000000_801d660f from hcpa
- 2026-05-30HCPACaptured HCPA_0778000000_b9ffbec9 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 10.3 mi | 20.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 14.7 mi | 29.4 |
| quarry | Four Corners | Lithia | 19.5 mi | 39.1 |
| quarry | Wingate Creek Mine | Lithia | 21.4 mi | 42.7 |
| quarry | South Pasture Mine | Lithia | 22.7 mi | 45.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 29.9 mi | 59.8 |
| quarry | South Fort Meade Mine | Lithia | 33.8 mi | 67.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 44.2 mi | 88.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_erp | FDEP_ERP_0461344-002-EI | 2026-05-24 | Open ↗ |
| fl_dor_cadastral | FDOR_203122ZZZ000003166200U_9221e5c2 | 2026-05-28 | Open ↗ |
| fdep_spgp | FDEP_SPGP_0461344-001-EI | 2026-05-28 | Open ↗ |
| fdep_spgp | FDEP_SPGP_0461344-002-EI | 2026-05-28 | Open ↗ |
| hcpa | HCPA_0778000000_9221e5c2 | 2026-05-29 | Open ↗ |
| hcpa | HCPA_0778000000_801d660f | 2026-05-29 | Open ↗ |
| hcpa | HCPA_0778000000_b9ffbec9 | 2026-05-30 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 0778000000
- Strap
- U-22-31-20-ZZZ-000003-16620.0
- Address
- 12104 672 HWY, RIVERVIEW
- Zip
- 33579
- Acreage
- 4.723 ac
- Sq ft
- 205,753
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/9221e5c2