Leads/91af7333
Approved · application_filedHillsborough County

HERON AND FRANCISCA VILLA

BRUTON ROAD, PLANT CITY, FL, 33565

~129loads
fill dirt
≤1 wk
Lifecycle
Filed as of Sep 12, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

HERON AND FRANCISCA VILLA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 9/12/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$311K
Actual — from source record
Acreage
1.159 ac
Parcel 0802200000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
VILLA HERON
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 1.2 ac disturbed, $311,362 valuation, ~129 est. loads (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0456575-002 from fdep_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_212726ZZZ000003312300U_91af7333 from fl_dor_cadastral
  3. 2026-06-03HCPA
    Captured HCPA_0802200000_91af7333 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
9.9 mi
Round trip
19.8 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill9.9 mi19.8
quarryTampa Cement Grinding PlantTampa20.0 mi40.1
quarryFour CornersLithia26.8 mi53.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 27.1 mi54.2
quarryWest Florida AggregateWebster27.7 mi55.5
sand pitGreen Bay MineDavenport31.5 mi63
sand pit474 Sand MineBrooksville31.6 mi63.2
sand pitGator Sand MineBrooksville32.0 mi64
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Modifications))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0456575-0022026-05-24Open ↗
fl_dor_cadastralFDOR_212726ZZZ000003312300U_91af73332026-05-28Open ↗
hcpaHCPA_0802200000_91af73332026-06-03Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0802200000
Strap
U-26-27-21-ZZZ-000003-31230.0
Address
BRUTON RD, PLANT CITY
Zip
33565
Acreage
1.159 ac
Sq ft
50,485
Homestead
NO
Owner of record
VILLA HERON
VILLA FRANCISCA
Last sale
2022-04-01
$280,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/91af7333