Leads/9159aaf8
Approved · planningPinellas County

AFFORDABLE HOUSING UNITS

1800 S PINELLAS AVE, TARPON SPRINGS, FL, 34689

~583loads
fill dirt
4 wk
Lifecycle
Permitted as of Aug 26, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

AFFORDABLE HOUSING UNITS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 8/26/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.1M
Actual — from source record
Acreage
5.2462 ac
Parcel 410209
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
MATT SYLVERAIN
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 5.2 ac disturbed, $1,100,000 valuation, ~583 est. loads (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0452487-001-EG from fdep_erp
  2. 2026-06-12FL_DOR_CADASTRAL
    Captured FDOR_15 27 24 39960 000 0120_9159aaf8 from fl_dor_cadastral
  3. 2026-06-13PCPAO
    Captured PCPAO_410653_9159aaf8 from pcpao
  4. 2026-07-02PCPAO
    Captured PCPAO_410209_9159aaf8 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
23.4 mi
Round trip
46.9 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa23.4 mi46.9
sand pitCounty Line MineSpring Hill24.1 mi48.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 24.4 mi48.7
quarryCentral State Aggregates LLCZephyrhill28.8 mi57.6
quarryCaloosa MaterialsRuskin35.2 mi70.4
quarryBrooksville QuarryBrooksville37.0 mi74
quarryBrooksville South Cement PlantBrooksville37.7 mi75.5
quarryCalcium PlantJacksonville40.6 mi81.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MATT SYLVERAIN

Permits & Sources

Every connector that's seen this project

EARLY SIGNALEnvironmental Resource Permit(FDEP ERP (Water - ERP Noticed General Permit))

Pre-construction environmental clearance for site work. Issued = project cleared to grade; contractor typically not yet selected.

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0452487-001-EG2026-05-24Open ↗
fl_dor_cadastralFDOR_15 27 24 39960 000 0120_9159aaf82026-06-12Open ↗
pcpaoPCPAO_410653_9159aaf82026-06-13Open ↗
pcpaoPCPAO_410209_9159aaf82026-07-02Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
410653
Strap
24-27-15-39960-000-0120
Address
1800 S Pinellas Ave
Zip
34689
Acreage
5.2462 ac
Sq ft
228,524
Year built
1925
Use
3029 Nursery, Roads ...
Subdivision
HILLCREST PARK
Owner of record
PCHA MILLS PROJECT INC
Last sale
2024-08-01
$100(transfer)
Appraiser valuation
Just (market)
$1,100,000
Assessed
$1,100,000
Taxable
$1,100,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/9159aaf8