Leads/9010ec71
Approved · application_filedPinellas County

1.84Airport Drive Ditch Fill, Clearwater

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

1.84Airport Drive Ditch Fill, Clearwater

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$104K
Actual — from source record
Acreage
Parcel 15 29 12 00113 000 0040
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
1630 Harbor Dr, LLC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_939841 from swfwmd_erp
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_15 29 12 00113 000 0040_9010ec71 from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
CITY OF CLEARWATER TRANSFER STATION · Clearwater
One-way
1.7 mi
Round trip
3.4 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
19.5 mi
Round trip
39.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa19.5 mi39.1
quarryCaloosa MaterialsRuskin26.9 mi53.9
quarryCentral State Aggregates LLCZephyrhill32.6 mi65.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 33.1 mi66.1
sand pitCounty Line MineSpring Hill33.9 mi67.8
quarryBrooksville QuarryBrooksville46.5 mi92.9
quarryBrooksville South Cement PlantBrooksville47.1 mi94.2
transfer stationCITY OF CLEARWATER TRANSFER STATIONClearwater1.7 mi3.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
1630 Harbor Dr, LLC
508 Brandon Ave CLEARWATER, FL 33765

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9398412026-05-17Open ↗
fl_dor_cadastralFDOR_15 29 12 00113 000 0040_9010ec712026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
15 29 12 00113 000 0040
County
Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/9010ec71