Leads/8e0278ee
Approved · unknownPOLK County

State 404 — 12347 U.S. HWY. 98 NORTH, LAKELAND

12347 US HIGHWAY 98 N, LAKELAND, FL, 33809

~31.0kloads
fill dirt + base rock
~48 mo
Lifecycle
Permitted as of Jun 9, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — 12347 U.S. HWY. 98 NORTH, LAKELAND

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 6/9/2022 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
124.138 ac
Parcel 232617000000011030
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
DUKE ENERGY FLORIDA INC
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: 124 ac disturbed, ~31034 est. loads (+30)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0305778-003-SFG from fdep_state404
  2. 2026-06-11POLKPA
    Captured POLKPA_232617000000011030_8e0278ee from polkpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
19.6 mi
Round trip
39.2 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill19.6 mi39.2
sand pitGator Sand MineBrooksville20.7 mi41.4
sand pitGreen Bay MineDavenport20.8 mi41.7
sand pit474 Sand MineBrooksville22.1 mi44.2
sand pitCypress SandLexington23.0 mi46
sand pitLake Sand PlantJacksonville24.1 mi48.1
sand pitHilochee Sand MineDavenport24.2 mi48.4
sand pitSILICA PLANTDavenport24.4 mi48.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
DUKE ENERGY FLORIDA INC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0305778-003-SFG2026-05-28Open ↗
polkpaPOLKPA_232617000000011030_8e0278ee2026-06-11Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
232617000000011030
County
POLK
Acreage
124.138 ac
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/8e0278ee