Leads/8d509990
Approved · unknownPASCO County

State 404 — PASCO COUNTY MULTI-FAMILY SITE

13124 STATE ROAD 54, ODESSA, FL, 33556

~895loads
fill dirt + base rock
6 wk
Lifecycle
Permitted as of Feb 9, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — PASCO COUNTY MULTI-FAMILY SITE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 2/9/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
3.58 ac
Parcel 27-26-17-0020-03600-0000
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
GAETO ANTHONY
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: 3.6 ac disturbed, ~895 est. loads (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0432735-001-NPR from fdep_state404
  2. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0432735-002-NPR from fdep_state404
  3. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0432735-003-SFI from fdep_state404
  4. 2026-06-03PASCOPA
    Captured PASCOPA_27-26-17-0020-03600-0000_3fba836b from pascopa
  5. 2026-06-03PASCOPA
    Captured PASCOPA_27-26-17-0020-03600-0000_8d509990 from pascopa
  6. 2026-06-03PASCOPA
    Captured PASCOPA_27-26-17-0020-03600-0000_93c69ca0 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
15.0 mi
Round trip
30 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.0 mi30
sand pitCounty Line MineSpring Hill16.7 mi33.5
quarryCentral State Aggregates LLCZephyrhill18.5 mi37
quarryTampa Cement Grinding PlantTampa20.1 mi40.2
quarryBrooksville QuarryBrooksville28.7 mi57.4
quarryBrooksville South Cement PlantBrooksville29.3 mi58.5
quarryCalcium PlantJacksonville32.4 mi64.8
quarryCaloosa MaterialsRuskin35.1 mi70.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
GAETO ANTHONY

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0432735-001-NPR2026-05-28Open ↗
fdep_state404FDEP_ST404_0432735-002-NPR2026-05-28Open ↗
fdep_state404FDEP_ST404_0432735-003-SFI2026-05-28Open ↗
pascopaPASCOPA_27-26-17-0020-03600-0000_3fba836b2026-06-03Open ↗
pascopaPASCOPA_27-26-17-0020-03600-0000_8d5099902026-06-03Open ↗
pascopaPASCOPA_27-26-17-0020-03600-0000_93c69ca02026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
27-26-17-0020-03600-0000
Strap
27-26-17-0020-03600-0000
Address
13124 STATE ROAD 54, ODESSA
Zip
33556
Acreage
3.58 ac
Sq ft
155,945
Use
Improved
Owner of record
GAETO ANTHONY
Last sale
2010-11-01
$675,000
Appraiser valuation
Just (market)
$1,782,052

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/8d509990