Leads/88c17856
Approved · unknown

Coastal Env — coastal_env (Coastal env permit)

Johns Pass

Load estimate pending
Lifecycle
Permitted as of Apr 24, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Coastal Env — coastal_env (Coastal env permit)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/24/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDEP coastal permit (coastal_env) — coastal_env. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_COASTAL_ENV
    Captured FDEP_COASTAL_ENV_52-0451225-005-EM from fdep_coastal_env

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
A & S OIL RECOVERY OF FLORIDA INC · St Petersburg
One-way
4.2 mi
Round trip
8.4 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
20.1 mi
Round trip
40.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin20.1 mi40.3
quarryTampa Cement Grinding PlantTampa23.4 mi46.8
quarryCentral State Aggregates LLCZephyrhill42.3 mi84.6
quarryWingate Creek MineLithia43.0 mi85.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 46.9 mi93.7
quarryFour CornersLithia48.5 mi97.1
sand pitCounty Line MineSpring Hill48.4 mi96.9
transfer stationA & S OIL RECOVERY OF FLORIDA INCSt Petersburg4.2 mi8.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_coastal_envFDEP_COASTAL_ENV_52-0451225-005-EM2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/88c17856