Approved · unknownLee County
FDOT — I-75 (SR 93) FROM S OF BONITA BEACH RD TO N OF ALICO RD - RE SURFACING
Lee County — FDOT Contract T1869
Load estimate pending
Lifecycle
Completed as of Jun 18, 2024
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — I-75 (SR 93) FROM S OF BONITA BEACH RD TO N OF ALICO RD - RE SURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$23.0M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — I-75 (SR 93) FROM S OF BONITA BEACH RD TO N OF ALICO RD - RE SURFACING. Vendor: PREFERRED MATERIALS INC.. Cost: $22,965,675. | FDOT public project (+15) | size signal: $22,965,675 valuation (+20) | FDOT public project (+15) | size signal: $22,965,675 valuation (+20) | FDOT public project (+15) | size signal: $22,965,675 valuation (+20) | FDOT public project (+15) | size signal: $22,965,675 valuation (+20) | FDOT public project (+15) | size signal: $22,965,675 valuation (+20) | FDOT public project (+15) | size signal: $22,965,675 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T1869_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Fort Myers Quarry · Fort Myers
One-way
7.7 mi
Round trip
15.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Fort Myers Quarry | Fort Myers | 7.7 mi | 15.5 |
| quarry | ALICO ROAD QUARRY | Miami | 8.1 mi | 16.2 |
| quarry | Fort Myers Mine | Jacksonville | 8.5 mi | 17 |
| sand pit | Corkscrew | Estero | 12.2 mi | 24.5 |
| sand pit | 846 Mine LLC | Naples | 12.7 mi | 25.5 |
| quarry | Bell Mine | Fort Myers | 14.6 mi | 29.2 |
| quarry | Golden Gate Quarry | Daytona Beach, FL | 14.8 mi | 29.6 |
| sand pit | Immokalee Division | Jupiter | 20.8 mi | 41.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T1869_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Lee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/884afc3a