Leads/873211e7
Approved · unknownManatee County

FDOT — I-275 (SR 93) FROM I-75 TO TERRA CEIA RIVER - RESURFACING

Manatee County — FDOT Contract T1909

Load estimate pending
Lifecycle
Active as of Aug 27, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — I-275 (SR 93) FROM I-75 TO TERRA CEIA RIVER - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$8.7M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — I-275 (SR 93) FROM I-75 TO TERRA CEIA RIVER - RESURFACING. Vendor: PREFERRED MATERIALS INC.. Cost: $8,699,382. | FDOT public project (+15) | size signal: $8,699,382 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,699,382 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,699,382 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $8,699,382 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T1909_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
10.7 mi
Round trip
21.5 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin10.7 mi21.5
quarryTampa Cement Grinding PlantTampa25.1 mi50.3
quarryWingate Creek MineLithia27.1 mi54.2
quarrySouth Pasture MineLithia37.4 mi74.8
quarryFour CornersLithia37.8 mi75.6
quarryCentral State Aggregates LLCZephyrhill45.5 mi91.1
quarryFlorida Shell & Fill Company LLCNaples46.1 mi92.2
quarrySouth Fort Meade MineLithia49.2 mi98.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T1909_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/873211e7